Tues. Hammerfest, July 29

CHANGE OF ROUTE:
Thanks to Andy for the info, Campbellville road is still under construction, and with all the chip seal out there we might as well head back to Interval Loop B:

2 Comments

  1. I’m afraid that number’s ex-directory Elavil 100 Mg 1.5. Assist the patient with prescription medications and propose to the

  2. May be better with the rain possibly coming in as well.

Comments are closed