June 28, Tuesday HAMMERFEST 6:30

Here is the challenging route we look forward to every year. After Rattlesnake, 6th Line doesn’t seem so bad – except you’ve just climbed Rattlesnake. Let’s all regroup in the Rattlesnake Point parking lot (left turn at the top)where bottles can be refilled and high-5s exchanged.

3 Comments

  1. Watson is okay. Still doing some work but the road is rideable provided workers have finished for the day, if not, we jog around Maltby/Victoria/Leslie? Applby will most definitely require the Limestone Rd/Canyon Rd detour.

  2. Is Watson open again? It was still closed on Sunday. If so we will need to take Maltby (SR15)/Victoria around it.

    The north side of Appleby Line has also been closed about halfway down the descent for most of the season, has anyone been there recently? If its still closed we’ll need to take Limestone Rd/Canyon Rd to get back to Campbellville Road.

  3. If people want to give me their camera’s/phones before the ride I don’t mind getting a picture at the top of rattlesnake of y’all duking it out for second place.

Comments are closed