May 31 – Tuesday A Ride – HAMMERFEST 6:30

Construction in Rockwood is pretty much done. Been told there’s 30m of gravel entering town. It means we can at last hammer down 5th Line from Oustic through Rockwood (carefully), up Guelph and 4th Line climbs finishing over the Berg. It could be epic. Take a minute to study the route.

Comments are closed.